A hyperloop route may zip between Kansas City and St. Louis
There still needs to be a feasibility study that will cost about $1.5 million (thankfully, paid from private funds) before there’s any construction. As far as hyperloop routes go, however, this is…
Visit link: A hyperloop route may zip between Kansas City and St. Louis
